ZARAFA INSTALL BMU ON ICONIC MANCHESTER BUILDING
The Zarafa team have recently completed the installation of a replacement BMU system on CIS Tower in Manchester.
The existing system required replacement and was removed from the building and replaced with a new system from Zarafa.