Our team carried out the design and rigging of semi circular temporary cradle to assist with construction of the Brighton i360 viewing tower, a major feature of the Brighton skyline.
A semi circular temporary cradle was designed and installed to allow our customer to carry out key structural works to the tower of the Brighton i360 project. Working with the equipment manufacturer, we provided a safe, cost effective and flexible working platform.